• Home
  • Civil Engineering
  • Social Media
  • WordPress
  • Mobile World
  • Technology News
  • Bollywood
  • About Us
  • Contact Us

THETECHFACE

May 21, 2020

Measurement of Oil bound Distemper| Oil bound Distemper Painting Process

Oil bound Distemper Painting Process A wall to be thoroughly scrapped with sand paper before Oil bound Distemper is applied. Oil bound Distemper Painting material should be of Good Quality with companies such as Asian,Nerolac,Berger Etc.  Where painting is to be done with Oil Bond Distemper, all uneven surfaces shall thoroughly cleaned of all dust […]

Article by Vivek Mishra / Civil Engineering / Measurement of Oil Bond Distemper, Oil Bond Distemper painting paints, Oil Bond Distemper Painting Process, Rule for deduction for Painting Work Leave a Comment

Trending Now

  • Quality control tests in building construction
  • Price variation in Civil works contracts
  • How to fix MS Rolling Shutter|Fabrication of MS Rolling Shutter
  • COVID-19 18-44 age group vaccination CENTER IN Lucknow
  • Pre-Construction Chlorpyrifos AntiTermite Treatment
  • How to Calculate Brick work Quantity in a Circular Manhole
  • SRH Mystery Girl Kavya Maran’s Images
  • Fakhar Zaman 193 runs from 155 balls Run Out by Quinton De Kock
  • Interlocking Paver Block: How to lay Interlocking Concrete Paver Block?
  • Concrete road construction Steps
IndiBlogger - The Indian Blogger Community

Copyright © 2022 · Education Pro Theme on Genesis Framework · WordPress · Log in