Construction Joints in Concrete – Construction bonding keys When the work is to be interrupted, horizontal and vertical construction joints and bonding keys shall be located and shall conform to the details given on the drawings. In case of water retaining structure, containment structure and other structures, water stops as specified on the drawing shall be … [Read more...]