Construction Joints in Concrete – Construction bonding keys When the work is to be interrupted, horizontal and vertical construction joints and bonding keys shall be located and shall conform to the details given on the drawings. In case of water retaining structure, containment structure and other structures, water stops as specified on the drawing shall be … [Read more...]
RCC road construction process- Trimix flooring
RCC cement concrete road construction process We in RCC road construction process today article topic discuss about the construction of RCC Pavements in Cement Concrete M-20. The cement concrete of grade M-20 as per designed mix to be laid in roads, pavements, kerbs laid on the prepared base, compacting with needle and surface vibrator, finishing, … [Read more...]
Construction of bituminous road-Process in Bituminous Road Construction
Road construction materials Murum for Road Construction Work : It shall be granular and gritty. It shall be free from dust, all rubbish, and any organic materials as well as clods of black cotton soils. The material shall be got approved prior to its use in road construction. The material shall be stacked on a level ground. If the item is only … [Read more...]